Bike Path at Spillway

This project consisted of a series of complex switchbacks on continuous sloped terrain that eventually tied into the spillway walking bridge.

Details

Client

  • City of Sioux Falls

Location

  • Sioux Falls, SD

Duration

  • 2 Months

Vertical

  • Asphalt Paving

Division

  • Black-Top Paving

Services

  • General Contractor